Puerto Rico is the dark island since September. We cannot get reliable information from the newspapers, from the government, from the media. I have lived in Puerto Rico since 1971 and am somewhat familiar with the PREPA system. Contact darkislandpr@gmail.com
Saturday, June 23, 2018
Saturday, May 12, 2018
22m PREPA Customers without light/ MWs of power on pier 4
http://caribbeanbusiness.com/senators-concerned-about-usace-exit-amid-puerto-rico-grid-repair/
Reporter Eva Llorens Velez says:
"Some of the senators noted that if Puerto Rico wants to be resilient and produce 30% of the energy with renewable sources, system redundancy must be in place. Bruce Walker, the assistant secretary of the U.S. Energy Department’s Office of Electricity Delivery and Energy Reliability, spoke at length about strategies to make the grid more resilient."
I find that most of the time "renewable" is code for solar and wind, although there are other renewable alternatives (nuclear, landfill gas, OTEC, waste to energy, cogeneration, to name a few).
Getting people to switch from electric to propane for cooking, water heating and clothes drying would save a lot of energy each year even though propane may not be renewable.
I've posted enough on solar and wind that I won't go into why they are bad ideas again.
Whatever else they are and are not, they are NOT resilient. Not in the face of a hurricane.
Udate on Sta Isabel Windfarm
I drove past last night and most of them were spinning merrily around. 3-4 were stopped but the rest were running.
So perhaps they are undamaged and/or repaired after all.
John Henry
Sunday, May 6, 2018
Open Thread
Have at it!
PRASA generator
Why does PRASA still have generators (and 24/7 guards) at pumping stations?
All three of these were running today and have been for months.
These are in rio grande, Luquillo and Fajardo.
Power has been restored at all 3 locations since jan/feb
Anybody know?
Monday, April 23, 2018
I drove through Guayama and drove up close to the AES coal plant. There was some steam venting but, looking closely at the heat plume, or rather the lack of a plume, it appeared that the plant might have been offline.
I also drove close to the Aguirre plant. Again, a bit of steam venting but not much of a heat plume.
In Yabucoa, at least 2 of the 3 gas turbines were running and, from the plumes, running fairly hard. Ditto the 2 GTs in Ceiba.
Santa Isabel Windfarm
Wednesday, March 7, 2018
A brief history of PREPA
This is a history of PREPA and its antecedents in the electric game. Interesting throughout.
https://www.elnuevodia.com/english/english/nota/historyshedslightonthepresentsituation-2390186/
Saturday, February 3, 2018
50mw factory nuclear generators
I've said before that I think we need to keep an open mind to nuclear power.
These modular nukes are built in a factory and erected onsite. Perhaps these or something like them is the key to acompact, hurricane proof and sustainable future.
http://www.nuscalepower.com/our-technology/technology-overview
Friday, February 2, 2018
Warehouse 5 fake news update
http://www.foronoticioso.com/fn/puerto-rico-department-of-justice-issues-report-on-the-prepa-warehouse-investigation/
There were no materials hidden in warehouse 5. It was fake news. I don't know who ginned it up or why but am happy to see it put to sleep.
Thursday, February 1, 2018
Naguabo windmills update
The regional weekly Presencia has an update on the totally destroyed windfarm in Naguabo. The owners say they will rebuild as soon as they get the insurance money.
Me? I doubt it. I expect that 5 years from now the will still be unrepaired. A good thing too as their output is horribly overpriced. 18 cents vs 10-12 for guayama's coal fired and Penuelas' gas generated juice. Us long suffering prepa customers just can't afford it.
http://www.presenciapr.com/destrozada-punta-lima-wind-farm-empresa-reconstruira-parque-eolico-en-naguabo/
Sunday, January 28, 2018
PREPA Warehouse 5
Turns out that this was just more fake news. Yes, ARMED!!! federal agents did go to the warehouse but pretty much all federal agents are armed so there is nothing unusual about this. It does works as a headline to get people spun up, though.
El Nueva Dia went to investigate (Good for you, END, for doing your job properly) and here is what they found:
PREPA “Warehouse 5" was no secret
The public corporation attributes federal intervention to a communication problem
...
However, the Director of Transmission and Distribution of PREPA, JosĆ© SepĆŗlveda Aponte, showed this newspaper documents that prove that, shortly after the passage of hurricane MarĆa, crews from PREPA and from private companies hired by the public corporation, as well as the Corps of Engineers, started looking for materials at that warehouse.
"All the new metal (transmission) towers that have been installed came from warehouse 5. It is the only warehouse with that material," he said.
Between September and October, about 200 requests were made, mostly by PREPA crews, according to the logbook shown to this newspaper. There are also entries made by Whitefish and Cobra companies.
As of October 28, there are entries of private crews hired by the Corps of Engineers, such as one made by Flour-Pike on October 28 for works on line 36800 in CanĆ³vanas. There is also an entry on November 11 for that same line.
Meanwhile, on November 18 a crew of the New York Power Authority, also subcontracted by the Corps of Engineers, appears. In another document he highlighted that Fluor was also in the warehouse in December, as well as Con Edison.
There was no information available about entries made after December.
...
https://www.elnuevodia.com/english/english/nota/prepawarehouse5wasnosecret-2390311/
Read the whole thing. My guess is that this was a political "SWATing" designed to gin up controversy. Much like the fake controversy that was ginned up over Whitefish.
Saturday, January 27, 2018
Link to Comments on proposed microgrid regulation
There are a number of interesting comments posted on the proposed microgrid regulztion. Here's the link to them
Friday, January 26, 2018
Comments on PR Microgrid Regulations
In an earlier post https://darkislandpr.blogspot.com/2018/01/microgrid-regulations.html I had linked to the proposed microgrid regulations, expressed my support and mentioned a couple of comments. I finally got them written up and submitted. My complete comments are below
I'm speechless
I had never heard of this before but apparently I owe PREPA money for those times. Sometimes I get dizzy here.
Our governor has, thankfully, put a stop to this stupidity.
Governor prohibits Puerto Rico utility from charging for private generator power
By Caribbean Business on January 17, 2018
SAN JUAN – A new law signed Wednesday by Gov. Ricardo RossellĆ³ Nevares prohibits the Puerto Rico Electric Power Authority (Prepa) from billing and charging customers for consumption of energy not generated by the public corporation, which implies the utility will not be able to charge for electricity produced by private generators.
The governor enacted Senate Bill 666, authored by Sen. Miguel Romero, to establish that Prepa will not be able to bill for energy produced by a generator in emergency situations, which includes blackouts for periods greater than 24 hours.
The signing of the new law occurs nearly four months after Hurricane Maria struck the island, with only 63% of the utility’s customers having electric service.
Read the whole thing. http://caribbeanbusiness.com/governor-prohibits-puerto-rico-utility-from-charging-for-private-generator-power/
Tuesday, January 23, 2018
Bye-bye PREPA!
Our governor just announced that PREPA will be privatized.
Hooray! Time to celebrate.
The devil is in the details of course but it is hard to find any downside to this at all.
The Puerto Rican people agree. In today's Primera Hora newspaper a poll finds 82% in Favor and12% opposed.
More later. In the meantime Caribbean Business has the story.
Hooray! Again.
http://caribbeanbusiness.com/governor-announces-puerto-rico-electric-utilitys-privatization-model/
Roosevelt Roads combined cycle
We need someone with some vision to build a 50 or even 100MW combined cycle plant in RR. Someone not including PREPA but perhaps one of the propane importers. This could be done as a microgrid for RR selling excess power to PREPA. Seems like a no brainer to me:
1) Location - At present most power generation is in the south and west requiring long transmission runs. This is not only costly, it is inefficient. Nor is it reliable as we saw with Irma and Maria. RR has plenty of vacant land to site the plant.
2) Interconnection - PREPA currently has 2 22MW GT generators at Daguao (Ceiba) ab out 1/2 mile from the end of the runway. These were installed in the early 70s to provide reliable power to the Naval station. A plant at RR could tie in at this substation. (I am guessing, I don't know how much could be connected there or how much of the plant output would be available for sale)
3) Fuel supply - Roosevelt Roads is a perfect place to bring in tanker loads of fuel and has existing fuel piers. Space for storage should not be a problem either. Ships or barges carrying oil or propane could dock and offload in the main harbor or in the auxiliary harbor near the drydock. The plant should be multi-fuel so it can use whatever is cheapest at the moment.
4) Customers - The governor wants to develop industry at RR. Having a plant there would provide primary customers for the juice and excess could be sold to PREPA. If RR develops industrially, there may even be customers for steam generated by waste heat.
5) Ruggedness - A CCGT installation would be pretty rugged and should withstand any hurricane with minimal if any damage. This is not the case with wind or solar.
In a previous note I commented that the new micro-grid regulation, while addressing combined heat and power (CHP) or cogeneration, does not make any mention of combined cycle. I presume it could be used but it should be made explicit.
For those unfamiliar with the concept of combined cycle, it is this:
An engine, either turbine or reciprocating is used to drive a generator. About 40% of the heat input is used with the rest wasted. The waste heat is recovered and used to drive a second turbine powering a second generator. This allows 60-70% (or more) of the energy input to be used.
Yes, that is a very, very, basic explanation. A much more detailed explanation is at https://en.wikipedia.org/wiki/Combined_cycle
The EcoElectrica LNG plant in Penuelas is a combined cycle plant.
Sunday, January 21, 2018
Pier 4 generator update (Again-1/21/18)
I happened to be in San Juan today but the San Sebastian Festival kept us out of the old city. I drove down my the channel in Isla Grande and the generators are still on Pier 4. No idea whether these are the same ones never sent out, are newly arrived generators, or the ones that were there before, sent out and returned as utility power is restored.
There's a lot of them and 40% or so of PR Residents still without power. Why can't some of these be used to provide power to communities? If nothing else, set them up in the street and let people run extension cords.
It's been 4 months since Maria. Some folks have been without power since Irma, going on 5 months now. Why aren't these generators being put to work?
Saturday, January 20, 2018
78 Miles of solar
That is 10,000MW nominal which translates to about 2,500 effective MW.
For a sens of scale, here is what the existing coal/solar plant looks like.
So I was thinking about how much space 10,000MW would occupy. Looking around I find that the AES and Humacao solar sites each occupy 6-7 acres per nominal megawatt. Panels will continue getting more efficient so let's say 5 acres per MW. 10,000MW will require 50,000 acres. That is about 78 square miles or 202 square kilometers.
That is a lot of land that can't be used for much else. Nothing will grow under the panels so we lose the carbon eating potential of plants, even if just weeds. Some of it can be built on roofs or over parking lots but even so we still lose a lot of land. Not just land but relatively flat land. You know, like you would use for agriculture. Flat land that we have precious little of
To picture just how much 80 square miles is, I put an 80sqm block on top of a map of PR. The yellow block is to scale and is 40 miles long by 2 miles wide. Of course, the panels will be distributed in smaller areas but the total cumulative area will be the same.
Two other problems with making us dependent on solar:
1) Resiliency - Puerto Rico experiences regular hurricanes and has since forever. There is no reason we should not expect another Maria in the future. Hurricanes and solar panels do not mix. Just take a look at the Humacao solar farm which was completely destroyed.
2) Cost - Solar is not cheap. At present AES sells coal powered electricity to PREPA for 9-12 cents/kwh. EcoElectrica sells LNG powered juice to PREPA for about the same price.
PREPA pays 18c/kwh for solar and has locked into contracts for 20 years at this price.
Detailed data on how much PREPA purchases and how much it pays from these and other plants is available at their site https://aeepr.com/Documentos/Ley57/Tablas%20Compra%20de%20Energ%C3%ADa.pdf
Puerto Rico must have cheap, reliable, clean energy. Solar is not the way to get there.
I will be happy to have AES or anyone else invest their own money in solar energy on the same basis as any other form of energy. No tax or regulatory sweeteners. Especially no sweetheart power purchase agreements. PREPA needs to buy solar on the same basis as they buy coal, gas, oil or other energy. They need to pay time based avoided cost. PREPA needs to purchase a mix of energy buying whatever is cheapest at any given minute.
Monday, January 15, 2018
Microgrid regulations
One of the things I learned is what I pioneer I am in PR energy development. I developed a microgrid back more than 30 years ago!
Without going into a lot of detail here, what it mainly does is allows individuals, companies, consumers, third parties, municipalities and pretty much anyone else to develop small scale power projects. These might serve a single plant or building or an area as large as a municipality.
Most importantly, it recognizes the right of third parties to sell electricity at retail under certain conditions. (This stems from the Alcon case discussed previously here http://darkislandpr.blogspot.com/2017/12/alcon-v-prepa.html) Microgrid operators can sell power to PREPA , to members (if a co-op), to themselves or to customers connected to the grid.
The goal, highly worthy in my view, is to get away from the entire island being dependent on a few distant central plants in Penuelas and Guayama and get power generation distributed closer to point of use.
It tries to encourage the use of renewables, not limited to wind and solar, but permits all types of energy generation for microgrids. It specifically mentions cogeneration, or "Combined Heat and Power" (CHP) as it calls it. I think this, combined in some applications with batteries, is the best way to go.
I really only have three comments, which I will be submitting, about the proposed regulation:
1) I think small scale (>10MW) packaged nuclear plants will become practical and available in the next 5-10 years. Nuclear is the ultimate renewable energy and should be included in the regulation.
2) CHP generally involves using a gas turbine or diesel engine to generate electricity then recovering the waste heat and using it for steam, chilled water or some other purpose. This boosts the system efficiency from @40% for electric only to 60-80%. Combined cycle is a form of cogeneration that uses the waste heat from the gas turbine to power a secondary steam turbine generator. Eco-Electrica and AES Guayama are both combined cycle cogenerators.
It is unclear in the regulation whether combined cycle will be permitted. I believe it should be permitted and the regulation should explicitly do so.
3) Microgrids can sell power only to those connected to the microgrid or to PREPA. I would like to see provisions for PREPA to wheel power between microgrids. A microgrid in Mayaguez may have excess capacity at certain times that could be used by another microgrid in Humacao. They should be able to inject the power into the PREPA grid in Mayaguez and sell it to the microgrid in Humacao. PREPA would receive a fee for use of their system for this transmission, of course. As I understand the current proposal, the Mayaguez plant would have to sell the excess to PREPA who would then sell it generally to their customers.
I seem to recall that PURPA requires wheeling for "Qualified Facilities" but it has been many years and I may be misremembering it.
Read the whole thing here:
http://energia.pr.gov/wp-content/uploads/2018/01/Proposed-Regulation-on-Microgrid-Development-CEPR-MI-2018-0001-1.pdf
Comments can be submitted prior to Feb 4 to comentarios@energia.pr.gov
Thursday, January 11, 2018
Got lights!
My lights came back last night about when a prepa crew routed around a bad xformer.
Still 20 or more houses without lights in my urbanization.
40% of puerto rico residents still witout light. Some since hurricane Irma. Since Maria in my casr. 110 days.
Tuesday, January 9, 2018
Roosevelt Roads powerhouse
As part of the plan, Nuevo Dia reports:
Other development includes the generation of sustainable energy, an area of great need, even more after the experience of Hurricane Maria. The structure, explained Laboy, already exists, it is a matter of enabling it.
Initially, between one and five megawatts of energy could be generated.
I wonder what structure he is talking about? Unless he is talking about the PREPA 40MW gas turbine across the road from Roosevelt Roads, the only structure I can think of is the old powerhouse. This was built in about 1940 and has not run since about 1945. The machinery was still there in 1974 but was removed and sat for years in the weeds in Fajardo where Office Max used to be.
The structure is interesting. It was designed to withstand simultaneous hits by 2 12" shells from a German Battleship. This was when it was thought the British royal family and govt would be evacuated to Roosey.
Here's a recent picture showing the construction:
The top roof is not a facade, that is solid reinforced concrete. If anything gets through this, there is an inner roof, about 6-8' thick. You can see this from about the top of the slit windows to the top of the platform where the stairs end. Building walls are about 6-8' thick concrete. (feet, not inches) Lots and lots of heavy rebar throughout.
It would be interesting to see it as a power plant again. Whatever they do with it, they won't tear it down. I knew the engineer who built it and he was asked to tear it down by the Navy in the 70's. Basically, he told me, it can't be done short of nuclear weapons. He is the one who told the construction details.
PR Nuclear power
Sort of.
Long ago there were plans to build a reactor in the beach town of Rincon. The containment dome is still there.
Looking for a picture just now, I see that it is now a museum. I'll have to visit and check it out.
Lots more at this link:
http://ansnuclearcafe.org/2016/04/14/nuclear-energy-for-puerto-rico/#sthash.vuvXVlhd.dpbs
PREPA also once bought a nuclear plant back in the 1970. For many years they were spending a significant amount of money each year to keep it in storage in France. (It has been years since I've heard of this, my memory is very hazy) The nuclear cafe site above does say this:
in 1968, PRWRA began to consider a more conventional nuclear plant. In May 1970, it ordered from Westinghouse a 583-MWe two-loop pressurized water reactor plant for a site at Islote. Practically nothing was accomplished on this project, which was finally cancelled in 1978, ending the Puerto Rican era of nuclear energy projects.
(PRWRA was Puerto Rico Water Resources Authority, the predecessor to PREPA)
Monday, January 8, 2018
Standby power and the grid
This is only partly due to the hurricane experience (last one before Maria was in 98) and more due to the unreliable power PREPA provides.
I would not be surprised if the total backup capacity was in the 500-1000MW range.
Very little of it is grid connected. It is mostly on a transfer switch.Or, in the case of residential, wired in with extension cords as needed.
I was thinking that it would be cool if somehow that capacity could be used instead of sitting idle. Kind of a pipe dream, interconnection and dispatch would be a nightmare.
Then I run across this:
NRG Energy and Cummins’ New Business: Backup Generators as Grid Assets
Still, a small but growing number of natural-gas-fired gensets in the market are clean enough to run outside of the strict parameters set for diesel in many U.S. jurisdictions, albeit with some big exceptions like California.
Last week, NRG Energy and Cummins unveiled a partnership that aims to take advantage of this flexibility to offer backup generators to a whole new class of commercial-industrial customers. The press release calls it a “platform,” and it is backed up by substantial in-market software expertise from both companies.
The proposition is this: get a Cummins genset for use when the grid goes down, and shave 10 to 15 percent off your energy bills by allowing it to run as part of an aggregated fleet of a “preliminary estimated hundreds of megawatts capacity,” according to the companies’ press release.
...
[Emph added-ED]
https://www.greentechmedia.com/articles/read/nrg-energy-and-cummins-new-business-backup-generators-as-grid-assets#gs.t54_UPA
Pretty good idea, connecting all this capacity, distributed at the user, rather than the supplier, end of the grid. Even better, since Cummins/NRG pays for it, you get onsite standby power for free without even the hassle of managing it.
"But", I hear you saying, "in PR only PREPA is allowed to sell electricity and isn't that what this is doing?"
Fortunately, the Alcon decision has largely busted that monopoly if people what to take advantage of it. So, not only a great idea but legal.
Now if they could just use it for cogeneration...